Winter weekend
10th November 2007 to 11th November 2007

A few photos from the weekend, service was timetable G, with 4 trains in each direction.

<-- Index | Showing 1-7 of 7 pictures | Index -->
Goathlan dstation at night, awaiting light engine from Pickering
Goathlan dstation at night, awaiting light engine from Pickering
D7628 and 75029 at Goathland, on the way back to Grosmont from Pickering
D7628 and 75029 at Goathland, on the way back to Grosmont from Pickering
In apalling light and weather, and with the ISO on the camera cranked right up, 30926 Repton runs through Northdale with the 10.50 ex Grosmont
In apalling light and weather, and with the ISO on the camera cranked right up, 30926 Repton runs through Northdale with the 10.50 ex Grosmont
Q6 63395 between near Abbots Farm with the 12.50 ex Grosmont
Q6 63395 between near Abbots Farm with the 12.50 ex Grosmont
30926 Repton storms up the bank just past Beckhole with the 13.50 ex Grosmont
30926 Repton storms up the bank just past Beckhole with the 13.50 ex Grosmont
Lambton tank No5 in  an almost empty Deviation shed
Lambton tank No5 in an almost empty Deviation shed
80135 catches the afternoon light, whilst awaiting overhaul
80135 catches the afternoon light, whilst awaiting overhaul